As I was looking over the WSS from Bill Yard to the end of the island, it dawned on me that there was a lot of space for more industries. My problem was that just wasn't prototypical. In a blinding flash of light I realized that whole thing wasn't perfectly prototypical anyway, so I decided to make a few changes.
First, where I had added the house track and planned the old Lexington Depot near 5th Avenue I would change to be the siding for Owens-Illinois in Welcome. There is also room for another industry and haven't totally decided what to do. It could be a fake Carter Lumber (although there is not really a spur there) or it could be Carolane Gas (no longer receives rail shipments).
The entire other side of the WSS is the NS interchange, PPG and Cotton Grove siding. There really is nothing else there unless I just add something in.
Tuesday, May 13, 2008
Sunday, April 27, 2008
Scenery On The NS Line
I've spent the last 4 months laying track, and can tell you it gets old after a while. So... I took a break this week and started on some scenery.
I started with the area just out of Charlotte staging on the lower level and just out of the pit on the upper. The area on the upper represents track between Bowers and Lake.
Both upper and lower levels on this side of the building will be done in fall colors. The opposite side of the building will be winter and the center island will be Spring/Summer.
I got really tired of laying track, so I took a break this week and worked on some scenery. For this section, I am trying a fall theme.
Thursday, April 10, 2008
Pen Operated Switches
Several people have asked me about the pen operated turnout controls. I know it was in one of the magazines, but I never looked at what was suggested there and made my own setup. (This was done for Atlas Code 55 turnouts and has not been tried on other types or codes.)
It starts with Bic Click type pens. I found some on sale at Office Depot.
You would think they were everywhere, but I tried half a dozen stores before finally finding them there.
Take the pens and pull them apart enough so that you can clip the end off, and while you're at it, cut the pocket clip off. I use rail nippers, then file the barrel smooth where the clip was. Reassemble the pen. I used the whole pen. There was some thought about replacing the ink cartridge, but I decided to take a chance.
You will also need a European-style terminal strip. I got a 12 position one from Radio Shack for $2 something. You'll have to cut the plastic off the terminals joiners. I used a Dremel cutting wheel to make a cut across the back of each, then cut the plastic away with my rail nippers and pulled the connector sleeves out with some regular pliers.
You will need to figure out where to drill the mounting hole for the pen depending on your benchwork. I used 1 x 4s for the face and had a plywood top in the staging yard where I was mounting mine.
So, I drilled as close to the edge as I could. I found a 1" dia. counterbore bit at Lowes for $8 or $9. It was worth every cent because the first time I tried using a plain wood boring bit and it made a mess of the hole.
After making the counterbore, I used a 3/8" flat wood boring bit to make the hole for the pen.
Glue the pen in the hole. I used something called Goop. Found it at Lowes and Hobby Lobby. Best stuff ever, but it can be a bit messy. Be careful.
I made a bead around the barrel just below the plunger. Stick the pen thru the faceboard from the backside and just barely let the tip extend past the the faceboard. I made mine stick out 1/8" because I am covering the faceplate with a masonite fascia board.
You can also color code the pens and counterbores if there are several close together. I may add colored targets later.
The last parts you'll need are some 1/8" dia plastic tube, and 16 and 18 ga. floral wire (or similar). I found floral wire precut in 18" lengths and tried it because it was soft enough to bend before breaking the turnout throwbar.
I drilled a 3/8" hole under where the hole is in the throwbar thru the deck and then mounted a thin block of wood under the deck to use as a spacer. I then used the Goop to attach the plastic tube to the spacer cutting about an inch or two short of each end.
I connected the 16 ga wire to the end of the pen with one of the terminal connectors, clipping the other end about even with the thru hole. I used the 18 ga. wire (bent at 90 degrees) up thru the deck into the throwbar. I did have to enlarge the throwbar hole with a 1/16" bit. Connect the 2 wires together with another terminal connector leaving some overlap for adjustment.
Give the Goop 24 hours to dry before adjusting the wire.
I connected the 16 ga wire to the end of the pen with one of the terminal connectors, clipping the other end about even with the thru hole. I used the 18 ga. wire (bent at 90 degrees) up thru the deck into the throwbar. I did have to enlarge the throwbar hole with a 1/16" bit. Connect the 2 wires together with another terminal connector leaving some overlap for adjustment.
Give the Goop 24 hours to dry before adjusting the wire.
Sunday, February 24, 2008
Splines and Track On The NS Sub
Another weekend passes with what seems like no progress. After running some errands Saturday morning, I finally got into the layout room around 1:30. Not long after I started I had some visitors that had been to one of the club shows.
After they left, I made a second pour on the Abbott's Creek water. The initial pour was rather brownish and I made this one lighter.
While the matte medium was drying, I took to the table saw cutting 40 or 50 splines which I used to start laying out the NS roadbed.
That was about as far as I got on Saturday. Sunday morning I checked out the now dried Abbott's Creek. Still a little brownish, but as good as I can do for now. I went ahead and mounted the shoreline and poured the finish matte layer. I'll follow later with a gloss layer for a wet look.
Went back to the NS roadbed. I lined and glued about 12 feet of roadbed and realized the best thing for the High Point yard would be plywood and tie that to the spline stringers.
After mounting the plywood, I went back and started soldering and laying track for the dual mains out of Dundee Yard (Danville). I left a #7 turnout for Jamestown and widened the tracks for the future High Point Depot.
The mains have been laid as far as the High Point Yard. I need to double check the sidings needed going into Thomasville and I can go ahead and lay the splines around the back corner heading into the pit opening.
After they left, I made a second pour on the Abbott's Creek water. The initial pour was rather brownish and I made this one lighter.
While the matte medium was drying, I took to the table saw cutting 40 or 50 splines which I used to start laying out the NS roadbed.
That was about as far as I got on Saturday. Sunday morning I checked out the now dried Abbott's Creek. Still a little brownish, but as good as I can do for now. I went ahead and mounted the shoreline and poured the finish matte layer. I'll follow later with a gloss layer for a wet look.
Went back to the NS roadbed. I lined and glued about 12 feet of roadbed and realized the best thing for the High Point yard would be plywood and tie that to the spline stringers.
After mounting the plywood, I went back and started soldering and laying track for the dual mains out of Dundee Yard (Danville). I left a #7 turnout for Jamestown and widened the tracks for the future High Point Depot.
The mains have been laid as far as the High Point Yard. I need to double check the sidings needed going into Thomasville and I can go ahead and lay the splines around the back corner heading into the pit opening.
Saturday, February 16, 2008
First Run On The WSS/HPT&D
On Friday, Feb 15 at 21:49:32 GMT, the first complete loop was made on the WSS/HPT&D sub of the Central Carolina Southbound.
The trip started at Bill Yard with an SD80MAC and 6 cars. It traveled south thru Lexington, Southmont up the helix by Flat Swamp, then northeast thru Denton where it picked up another 6 cars, to High Point where the loco turned on the Wye and returned to Bill Yard.
There was 1 hopper that went on the ground not once but twice, and was immediately bad ordered. There were no other problems encountered.
Signed
KB, Owner, Superintendant, Yardmaster, Trainmaster, Engineeer, Conductor, Brakeman, Chief Cook, Bottlewasher
The trip started at Bill Yard with an SD80MAC and 6 cars. It traveled south thru Lexington, Southmont up the helix by Flat Swamp, then northeast thru Denton where it picked up another 6 cars, to High Point where the loco turned on the Wye and returned to Bill Yard.
There was 1 hopper that went on the ground not once but twice, and was immediately bad ordered. There were no other problems encountered.
Signed
KB, Owner, Superintendant, Yardmaster, Trainmaster, Engineeer, Conductor, Brakeman, Chief Cook, Bottlewasher
Saturday, February 9, 2008
Copper Fencing
I bought a copper mesh on sale at Hobby Lobby after Christmas. So, I though I'd try it out. I sprayed it with Miracal Metallic Silver and cut a thin strip. It looks as close to scale as anything else I've seen.
Monday, February 4, 2008
2nd Yard Complete
The second yard has been completed. It will represent Charlotte as one end of the point-to-point.
The other end, Danville, was completed several weeks ago. Both will be ballasted at some point, but I think I'll wait until everything up and running.
Subscribe to:
Posts (Atom)