After the end of the NC Rail Run in September, I closed the doors on the train room and pretty much did nothing except for the November and January Ops sessions. I then got the idea to expand the area over Charlotte Yard. I added onto the benchwork there and expanded the Thomasville Beltway.
There will be 2 sections to the Beltway track, one here and the other on the opposite side of the pit.
No comments:
Post a Comment