Sunday, August 19, 2007

Raising The Roof

Well, we have an enclosed building. With the help of a couple of friends and relatives, the whole tin roof was put on in 2 days. Never mind that both days were almost to the 100 degree mark. How can I ever repay them?


Friday, August 17, 2007

Reconsidering The Plan

I had to do some traveling yesterday (to pick up the metal for the roof. (Roof construction begins Sat). I started running trains in my mind. Start points, terminating points. It just didn't work well for me... the overall from Greensboro to Salisbury seemed short, that would be okay if everything was local I guess. Thought I needed to cover more area, at least in principle. The overall track size doesn't change, just the names of the places.

I never could find the right place for staging. Kept trying to stick it in the lower left corner, but that made it a short trip to Linwood, then long trip all the way back around. Plus this eliminates the walk thru I was going to have to put to cut thru the center peninsula.

There has to be a solution that covers it all!!