Saturday, March 7, 2009

March 2009 Ops Session

We had a test run in Oct 08 and a second test in December. As of January 09, The CCSB will have Operations Sessions every two months. This is the second full time session and there were about 14 people attending.

This was the first test of the Linwood Hump. Larry Keller and Jeff Lindstrom were scheduled to be the first yard operators, but Jeff came down with the flu just before the session. Josh Blevins filled in for Jeff. Reports were that the hump worked well.


Monday, March 2, 2009

Time Off For Snow

Sorry, this is NOT my model but I thought the recent snowfall made for some pretty good scenes. These are from station name Lee just north of Linwood Yard in Linwood.